Green Stormwater Infrastructure Project

The general project scope includes converting an existing ditch into a bioretention facility along the east perimeter of the Suisun City Park and Ride Lot located at the northwest corner of Lotz Way and Civic Center Boulevard. The project scope also includes, but is not limited to landscaping/irrigation and paving, as well as installing trash capture devices, fencing, interpretive signage, and gravel blankets.

Status

Bidding Closed

Bid Date 8/16/23 2:00pm

Company & Contacts

City of Suisun
Nick Lozano (nlozano@suisun.com) /  
Gemma Geluz (ggeluz@suisun.com)

Location

Suisun City, CA

Documents

The Engineers Estimate is $700,000