Suisun City Fire Dept. Remodel - Phase 1
Status
Bidding Closed
Prebid Date | 10/9/24 10:00am |
Bid Date | 10/23/24 2:00pm |
Location
City of Suisun City, CA
The Project scope:
A. Summary Project Description:
Base Bid: Phase 1 consists of Remodeling the existing fire station separation wall between the apparatus bay (garage) and business/dorm area into a 2-hour rated wall separation. The proposed upgraded 2-hour rated fire wall separation is to extend to upper roof deck. Kitchen door, storage, lobby door and attic doors are to be relocated and upgraded to corresponding rated openings. The relocated openings are in coordination with phase II future remodel plans.
Phase I remodel also includes the replacement of the existing water heater in addition to the relocation and upgrade of one (1) electrical panel.
Additive Alternate: The existing single shower room is to be divided into two separate shower areas with a new shower partition and individual shower heads and Shower area new tile finishes and shower accessories.
B. Contract Scope: Construction, demolition, renovation, hazardous material removal, site acquisition, construction financing, and facility operations during occupancy.
For bonding purposes, the Engineers Estimate is $150,000-250,000.