Sidewalk Gap Closure Project
The project scope is to complete a 4” thick concrete sidewalk within a 5-foot wide strip between the existing curb and the existing sidewalk along the frontage of the parcel at the southeast corner of Marina Boulevard and Buena Vista Avenue. Compacted Class 2 Aggregate Base (AB) structural section on which concrete is to be poured is pre-existing. The project location is specifically along the west side of Marina Boulevard from Buena Vista Avenue to a point approximately 300 feet to the south, as well as along the south side of Buena Vista Avenue from Marina Boulevard to a point approximately 500 feet to the east.