Driftwood Drive Path Gap Closure Project

In general, the Project consists of continuing construction of a 10-foot-wide concrete Class I bikeway along the south side of Driftwood Drive from a point approximately 200 feet west of Marina Boulevard to the Driftwood Drive/Marina Boulevard intersection. This path segment will close the gap between the existing 10-foot bikeway and the Grizzly Island Trail The Project will also include, but not limited to, removing and installing sidewalk and curb/gutter; upgrading curb ramps to ADA-compliant curb ramps; striping and pavement markings; and storm drain improvements that include catch basins, underground pipe, storm drain manhole and repaving for surface drainage purposes.

Status

Bidding Closed

Bid Date 4/17/24 2:00pm

Company & Contacts

City of Suisun
Nick Lozano, at nloano@suisun.com & Gemma Geluz at ggeluz@suisun.com  

Location

The Driftwood Drive Path Gap Closure Project is located in Suisun City, partially fronting Crystal Middle School.

Documents

For bonding purposes, the Engineers Estimate is $330,000.