Driftwood Drive Path Gap Closure Project
In general, the Project consists of continuing construction of a 10-foot-wide concrete Class I bikeway along the south side of Driftwood Drive from a point approximately 200 feet west of Marina Boulevard to the Driftwood Drive/Marina Boulevard intersection. This path segment will close the gap between the existing 10-foot bikeway and the Grizzly Island Trail The Project will also include, but not limited to, removing and installing sidewalk and curb/gutter; upgrading curb ramps to ADA-compliant curb ramps; striping and pavement markings; and storm drain improvements that include catch basins, underground pipe, storm drain manhole and repaving for surface drainage purposes.